The Calculation of Building Volume and Cost for the Scaffolding

Time:2017/08/09

A, scaffolding using range
Construction area of calculation in accordance with the rules commonly, can calculate the construction area of industrial and civil construction projects, shall be implemented by all the composite scaffold quota project.

 

 

 

 

scaffolding

 

 

Second, the project including the content of the scaffold quota
Scaffolding quota in the project, including the foundation of the building, the exterior masonry, pouring concrete, component assembly, the height is 3.6 m above the metope whitewash use scaffolding and feeding platform, safety net, etc. Various factors. Therefore, all the scaffolding usage, calculated on the basis of the construction area in addition to the following conditions shall be calculated on single scaffold quota project, the rest are calculated not single scaffold.


Note: the above scaffolding quota project including content
1 design requirements, indoor height more than 3.6 m ceiling plaster, paint shop nail surface, pointing the adornment such as the build-up and scaffolding and more than 10 m ceiling (brush) slurry using scaffolding.
2, the structure of the indoor equipment foundation, large pool slot, according to the construction organization design (or construction scheme, construction of scaffolding must be raised.


3, buildings and vertical protective aircraft level protection.
4, boiler room of the building be a chimney and attached to the wall on the roof of the erection of scaffolding.
Three, scaffolding calculation of quantities

 

 

 

 

scaffolding

 

 

 

1, according to the structure of the scaffold construction area of calculation.
2, multi-storey building height more than 6 m, 6 m above and single-layer workshop building roof height more than 6 m (the area of the building covers an area of more than 10%), according to this chapter, the fee per more than 1 m quota calculation scaffold project (increasing height within 0.6 m is not calculated layer, calculated on an increase of 0.6 m or above.)
 