WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

What Are the Other Relevant Provisions of Scaffolding in the Market

Time:2017/08/09

1, building scaffolding, height: the natural outdoor floor to the roof eaves wall surface (or daughter) crest elevation.
2, the height of the building: the bottom or middle tier, this layer design indoor ground to the upper ground elevation; The top since this layer design indoor ground to the top of the roof plate height.

 

 

 

 

scaffolding

 

 

3, vertical protective frame, according to the natural ground level ground to the top layer bar positioned between the height, multiplied by the actual erection of calculate with square metre length. With the help of outside scaffolding, calculated at 50%;Set-up, separately calculated at 100%.


4, building vertical closed according to the actual erection of calculate with square metres length times the height.
5, an outer layer fully enclosed materials according to the federated eye network, using other sealing materials, a conversion price of federated eye network, other unchanged. Completed the project federated eye network consumption is adjusted for 55 m2;New Year's project, federated eye network according to the annual piecewise calculation.


6, ramps: after approval of the construction scheme to build the ramps
(1), ramps, according to the approval of the construction scheme and construction organization design, the difference between different height calculation.


(2), ramps is dependent on ramps, compiled, independent ramps according to attachment ramps quota project coefficient multiplied by 1.8
7, according to the approved construction scheme (construction organization design), the level of support beam amortized in accordance with the tonnage.

 

 

 

 

scaffolding

 

 

 

8, boiler room (or attached) on the chimney, the part out of the roof and outdoor independent column, frame column (not the building area is calculated by the erection of scaffolding according to the section of peripheral circumference of 3.6 m times the height, implement double exclusive scaffold corresponding quota project.
 

Related News