1) homework every 1 m2 frame on the actual construction load weight (personnel, materials, and machines) shall not exceed the specified value or under construction design value. Construction load (homework layer on the weight of the personnel, equipment, materials) standard, structure of the scaffold to take 3 kn/m2;Tool scaffolding 3 kn/m2.

 

 

 

 

scaffolding

 

 

 

2) set of materials on the surface of the frame should be packed in solid, shall not affect the construction operations and personnel. According to the passage of a cart for erection of scaffolding shall ensure lanes open. It is strictly prohibited on personnel cart running, regression or decay on the surface of the frame. 


3) the height of people working in the rack the biggest should be in normal operation can be performed for degrees, ban on the plane board padded implements or single piece of scaffold to increase operating height. 


4) in the homework, banned the basic framework of the dismantled scaffold, integrity bar, connecting bar fasteners. Because of operational requirements need to dismantle the truly, must be approved by competent personnel, adopt corresponding remedy measures, and in the homework finished, be reinstated in a timely manner. 


5) workers in the frame work, should pay attention to safety protection and the safety of others, to avoid a collision, slip and fall. It is strictly prohibited in the rack frolicking and sitting on a rail fine.

 
6) personnel scaffolding must go up and down set security access, forbidden climbing scaffold

 

 

 

scaffolding

 

 

7) per shift staff to work in stores, should first check with or without affecting safe operation problem, behind the exclusion and solve began to work. Found in the assignments unsafe conditions and signs, should immediately stop operation for inspection, resolve to return to normal after the operation; Found to have abnormal and dangerous situation, immediate notice must be given to all on personnel evacuation. 